getting ready for show time

This commit is contained in:
Thomas Cole 2022-02-16 20:43:23 -07:00
parent f4dc14073c
commit 5b4d1a2cf2

View File

@ -61,7 +61,7 @@
<section id="but-why">
<div class="align-left">
<p>Why does a church need an IT person?</p>
<p>Why does a church need a full time IT person?</p>
</div>
<hr>
<div class="r-stack">
@ -74,14 +74,15 @@
</ul>
</div>
</div>
<div class="r-stretch">
<div class="r-stretch"></div>
<aside class="notes">
<ul>
<li>The Volunteers CLC has had in the past were limited in what their strengths were. They often were at the end of their career and had lots of knowledge but were set in their ways.</li>
<li>From this, the need for a managed IT service company was born. The company CLC partnered with implemented many of the systems that are still in use today</li>
<li>However, this has a downside. All interaction with this company was through a ticketing system.</li>
<li>The advent of this position combined the best of both worlds. Being onsite, this allows for quicker time to resolution of technical issues.</li>
</ul>
</div>
</aside>
</section>
<section>
@ -137,8 +138,6 @@
</ul>
</aside>
</section>
<!-- Add background to build the case. SBT, John clarke, Campus wide zoom calls. Immediacy of being on site. -->
<section id="how-much">
<h2>How much will this cost?</h2>